• The final stage of the Loch Lomond Brewery install.The final stage of the Loch Lomond Brewery install.The final stage of the Loch Lomond Brewery install.The final stage of the Loch Lomond Brewery install.The final stage of the Loch Lomond Brewery install.

We installed an automated mill and delivery system to help with batch brewing, which included a BM Silo, Skiold transpork augers and conveyor systems

The system utilises the BM Silo which we installed earlier on in the year. The Brewer tells the system what batch size the next brew requires, and the system automatically mills and delivers the required amount to the tank.

We used a frequency controlled auger to optimise the mill process and multiple sensors to monitor smooth operation.

A Skiold transpork chain and disc conveyor system delivering the milled material around the plant. We also supplied a computer control panel for Automated operation.

 

LOCH LOMOND A 420 X 315LOCH LOMOND C 420 X 315

Newsletter Sign Up Stay in touch with us at Danagri-3S
by signing up to our regular newsletter.
Loading, please wait...